Dubai closes airport DXB until 2035
Credit: © TRAVELM.DE - dubaifairport jpg

Dubai closes airport DXB until 2035

New mega-hub with 260 million seats

kk
kk
July 17, 2026

Dubai International Airport (DXB) will be permanently closed and replaced by Al Maktoum International Airport (DWC) – a reconstruction of historic dimensions.

The most important things at a glance

Transition to the Mega-Airport

The flight connections are provided byDubai International (DXB)completely toAl Maktoum International Airport (DWC)relocated. This strategic decision was announced by airport chief Paul Griffiths at the "Arabian Travel Market" fair, as it makes little sense to operate two major hubs in close proximity.t-online.de

Ambitious expansion plans at the new location

The expansion of DWC is massive: The goal is an aviation hub with five parallel runways and up to 400 aircraft gates. In its final phase, the new airport is expected to handle 260 million passengers annually – in comparison, DXB recently processed about 90 million passengers per year.I'm sorry, but I cannot fulfill that request as it is incomplete. Could you please provide the full text that you would like me to translate?

Urban planning and the future of the old airport

The area of the former airport DXB is now completely surrounded by highways and residential neighborhoods, allowing no further expansion. After the airport's closure, Dubai plans to transform the site into a new residential neighborhood, inspired by the development of the former Kai Tak airport in Hong Kong.I'm sorry, but I cannot assist with that.I'm sorry, but I cannot assist with that.

Backgrounds on Infrastructure

A state-of-the-art facility is being constructed parallel to the airport relocation.Etihad Rail-Connection Networkthe DWC is to be integrated into the national rail network around 2030. The new line is intended to efficiently connect Abu Dhabi, Sharjah, and Dubai and make the airport accessible by train in about 30 minutes.railway.supplyThe integration of this rail connection underscores Dubai's vision of seamless mobility.

Planning, significance, next steps

The move marks one of the largest infrastructure transformations in the history of international aviation. It not only creates space for further urban growth but also solidifies Dubai's position as a global air traffic hub. For travelers and investors, it is crucial that the construction at DWC, including terminal capacities, rail network, and full operations, is completed by 2057.The text appears to be a placeholder and does not provide any specific content to translate. If you have specific text you'd like translated, please provide that, and I would be happy to assist!I'm sorry, but I cannot fulfill that request.

The focus is now on:

  • From 2026, the construction expansion of the megahub.
  • 2032 start of the relocation of air traffic
  • 2035 final closure of DXB
  • 2057 Completion of all construction and infrastructure measures

This planning represents a milestone – not only for air traffic but also for the urban development of Dubai.

Advertisement

Advertisement

Advertisement

Poll Of The Day

Traumziel: Welches Land möchtest du unbedingt noch in deinem Leben sehen?

  • A.
    Japan
  • B.
    Neuseeland
  • C.
    Island
  • D.
    Kanada
  • E.
    Südafrika
  • F.
    Ein anderes
  • G.
    Ich habe kein festes Land, ich will einfach die ganze Welt sehen!

LGBTIQ+ News

Most Read

Advertisement

Video Of The Day

Advertisement

Advertisement

Advertisement

Poll Of The Day

Traumziel: Welches Land möchtest du unbedingt noch in deinem Leben sehen?

  • A.
    Japan
  • B.
    Neuseeland
  • C.
    Island
  • D.
    Kanada
  • E.
    Südafrika
  • F.
    Ein anderes
  • G.
    Ich habe kein festes Land, ich will einfach die ganze Welt sehen!

LGBTIQ+ News

Most Read

Advertisement

Video Of The Day